Track renewal and renewal of railway overpass and culverts between Haideburg - Wolfen ( line 6411)

  • EC verification according to Directive (EU) 2016/797 for the subsystem ‘Infrastructure’ according to module SG
  • Project: Line 6411 with upgrading and renewal of railway overpasses and culverts
    • Speed increase from 120 km/h to 160 km/h with reassessment of existing level crossings and earthworks
    • Renewal of 2 railway bridges and 3 culverts
    • Partially renewed stop at Marke, stop at Raguhn and stop at Jeßnitz as well as 3 level crossings
Haideburg
Haideburg

Renewal of the Herzwäldchen railway overpass (EÜ) and extension of the railway embankment

  • EC verification according to Directive (EU) 2016/797 for the subsystem ‘Infrastructure’ according to module SG
  • Project: Line 2631 from km 123.130 to km 123.780
    • Truss girder, span 45.6 m, section 2631
    • Swinging of the route (approx. 8.5 m) on the axis of the new level crossing by widening the railway embankment on one side
    • Bridge area: new superstructure with interception and guidance devices
    • Swivelling areas: Reconstruction with old usable superstructure materials
Herzwaeldchen
Herzwaeldchen

Renewal of railway overpass (EÜ) Nistertal (line 3730)

  • EC verification according to Directive (EU) 2016/797 for the subsystem ‘Infrastructure’ according to module SG
  • Project: Renewal of Nistertal railway crossing, section 3730 from km 41.278 to km 41.383
    • Renewal of carriageway slab from km 41.30 to km 41.36
    • Repair of the three-span arch with clear widths of 10m + 22m + 10m
    • Renewal of superstructure with guides and safety gear
Nistertal
Nistertal

New construction of the Sagehorn station on the 2200 Wanne-Eickel - Hamburg line

  • EC verification according to Directive (EU) 2016/797 for the subsystem ‘Infrastructure’ according to module SG
  • Project: New construction of the Sagehorn station
    • Renewal of 2 outer platforms (2 edges of 220 m each)
    • New construction of platform surface, access routes, passenger overpass and weather shelters
    • New construction of platform equipment, signage, signposting system, lighting and sound system
Sagehorn
Sagehorn

Renewal of Finnentrop power substation

  • EC verification according to Directive (EU) 2016/797 for the subsystem ‘Energy’ according to module SG
  • Project ‘Renewal of the Finnentrop substation (UW) on line 2800 at km 61.75’
ENE_Unterwek
ENE_Unterwek
Copyright: Deutsche Bahn AG / Claus Weber

CFL Class 4000 - train radio

  • EC verification according to Directive (EU) 2016/797 for the CCO subsystem
  • NNTR verification certificate DE related to the TSI LOC&PAS
  • Client: CFL
    • Removal of the ZFM21 train radio system
    • Further use of loudspeaker and roof antenna
    • Installation and commissioning of the MESA 26 train radio system
CFL_Zugfunk
CFL_Zugfunk
Copyright: Société Nationale des Chemins de Fer Luxembourgeois

BR442 - Conversion of the train radio to MESA26

  • EC verification according to Directive (EU) 2016/797 for the CCO subsystem
  • EC verification certificate for the CCS TSI
  • NNTR verification certificate DE related to the TSI LOC&PAS
  • Client: DB Regio AG
  • Conversion of TALENT 2 multiple units to MESA 26
  • 12 different sites
  • 2 variants: single-mode and dual-mode
  • Continuation of use of existing system components
Copyright: DB AG / Weber

TRAXX 3

  • NNTR verification certificate LU for TSI RST
  • Client: Alstom Transportation Germany GmbH
  • Electric multi-system locomotives TRAXX3, for (additional) intended use in Luxembourg
  • Max. Speed 160 km/h (Luxembourg: 120 km/h)
  • ETCS (ETCS Baseline 3 Maintenance Release 1) Class B train protection systems PZB, LZB and SHP
TRAXX 3
TRAXX 3

TGV 2N2

  • NNTR verification certificate DE related to the LOC&PAS TSI
  • Client: SNCF
  • Retrofitting of TGV 2N2 multiple units with new version of the integrated Class A train control system (bi-standard ERTMS/TVM)
  • Replacement of the existing Balise Transmission Module (BTM) and Euroantenna with Balise Loop Transmission Module (BLTM) and Euroloop-compatible Euroantenna-L
TGV 2N2
TGV 2N2
Copyright: DB AG / Emersleben

Type Uacns 75 goods wagon

  • EC verification according to Directive (EU) 2016/797 for the RST subsystem
  • EC verification certificate for TSI WAG and TSI NOI
  • Client: Feldbinder Spezialfahrzeugwerke GmbH
    • 4-axle silo wagon of type Uacns (commercial designation: BEUT 75.4-3/1)
    • Two-axle bogies of type Y25
    • Aluminium container with a volume of 75 m³
Uacns
Uacns

ICE 4 high-speed multiple-unit train

  • EC verification according to Directive (EU) 2016/797 for the RST subsystem
  • EC verification certificate for the TSI LOC&PAS
  • NNTR verification certificate DE related to TSI LOC&PAS 
  • Client: Siemens Mobility GmbH
    • Software versions 11, 12 and 13
    • the driving dynamics at 265 km/h (K3s, K4s)
    • the modification of the seat cushions
    • annual surveillance audits of the relevant production sites
DB196958