Track renewal and renewal of railway overpass and culverts between Haideburg - Wolfen ( line 6411)
- EC verification according to Directive (EU) 2016/797 for the subsystem ‘Infrastructure’ according to module SG
- Project: Line 6411 with upgrading and renewal of railway overpasses and culverts
- Speed increase from 120 km/h to 160 km/h with reassessment of existing level crossings and earthworks
- Renewal of 2 railway bridges and 3 culverts
- Partially renewed stop at Marke, stop at Raguhn and stop at Jeßnitz as well as 3 level crossings
Renewal of the Herzwäldchen railway overpass (EÜ) and extension of the railway embankment
- EC verification according to Directive (EU) 2016/797 for the subsystem ‘Infrastructure’ according to module SG
- Project: Line 2631 from km 123.130 to km 123.780
- Truss girder, span 45.6 m, section 2631
- Swinging of the route (approx. 8.5 m) on the axis of the new level crossing by widening the railway embankment on one side
- Bridge area: new superstructure with interception and guidance devices
- Swivelling areas: Reconstruction with old usable superstructure materials
Renewal of railway overpass (EÜ) Nistertal (line 3730)
- EC verification according to Directive (EU) 2016/797 for the subsystem ‘Infrastructure’ according to module SG
- Project: Renewal of Nistertal railway crossing, section 3730 from km 41.278 to km 41.383
- Renewal of carriageway slab from km 41.30 to km 41.36
- Repair of the three-span arch with clear widths of 10m + 22m + 10m
- Renewal of superstructure with guides and safety gear
New construction of the Sagehorn station on the 2200 Wanne-Eickel - Hamburg line
- EC verification according to Directive (EU) 2016/797 for the subsystem ‘Infrastructure’ according to module SG
- Project: New construction of the Sagehorn station
- Renewal of 2 outer platforms (2 edges of 220 m each)
- New construction of platform surface, access routes, passenger overpass and weather shelters
- New construction of platform equipment, signage, signposting system, lighting and sound system
Renewal of Finnentrop power substation
- EC verification according to Directive (EU) 2016/797 for the subsystem ‘Energy’ according to module SG
- Project ‘Renewal of the Finnentrop substation (UW) on line 2800 at km 61.75’
CFL Class 4000 - train radio
- EC verification according to Directive (EU) 2016/797 for the CCO subsystem
- NNTR verification certificate DE related to the TSI LOC&PAS
- Client: CFL
- Removal of the ZFM21 train radio system
- Further use of loudspeaker and roof antenna
- Installation and commissioning of the MESA 26 train radio system
BR442 - Conversion of the train radio to MESA26
- EC verification according to Directive (EU) 2016/797 for the CCO subsystem
- EC verification certificate for the CCS TSI
- NNTR verification certificate DE related to the TSI LOC&PAS
- Client: DB Regio AG
- Conversion of TALENT 2 multiple units to MESA 26
- 12 different sites
- 2 variants: single-mode and dual-mode
- Continuation of use of existing system components
TRAXX 3
- NNTR verification certificate LU for TSI RST
- Client: Alstom Transportation Germany GmbH
- Electric multi-system locomotives TRAXX3, for (additional) intended use in Luxembourg
- Max. Speed 160 km/h (Luxembourg: 120 km/h)
- ETCS (ETCS Baseline 3 Maintenance Release 1) Class B train protection systems PZB, LZB and SHP
TGV 2N2
- NNTR verification certificate DE related to the LOC&PAS TSI
- Client: SNCF
- Retrofitting of TGV 2N2 multiple units with new version of the integrated Class A train control system (bi-standard ERTMS/TVM)
- Replacement of the existing Balise Transmission Module (BTM) and Euroantenna with Balise Loop Transmission Module (BLTM) and Euroloop-compatible Euroantenna-L
Type Uacns 75 goods wagon
- EC verification according to Directive (EU) 2016/797 for the RST subsystem
- EC verification certificate for TSI WAG and TSI NOI
- Client: Feldbinder Spezialfahrzeugwerke GmbH
- 4-axle silo wagon of type Uacns (commercial designation: BEUT 75.4-3/1)
- Two-axle bogies of type Y25
- Aluminium container with a volume of 75 m³
ICE 4 high-speed multiple-unit train
- EC verification according to Directive (EU) 2016/797 for the RST subsystem
- EC verification certificate for the TSI LOC&PAS
- NNTR verification certificate DE related to TSI LOC&PAS
- Client: Siemens Mobility GmbH
- Software versions 11, 12 and 13
- the driving dynamics at 265 km/h (K3s, K4s)
- the modification of the seat cushions
- annual surveillance audits of the relevant production sites